Why JISC

Tier 4 Ready
we host 2 different power stations with an additional backup from a hydroelectric powerplant, that could produce a total of 60,000 megawatts.

World Class Infrastructure
not only we do have sophisticated fiber optic infrastructure throughout, but also has the ability of customizing ducting design, MMR and Colocations facilities. in addition, the traffic would be at ease with the ROW 50-meter roads (8 lanes) with fast & slow lanes